10 bbl Jacketed, insulated, and cladded Fermenter
12 gage 304 #4polished shell construction.
- Duel zone glycol jackets (sidewall and cone), W/2″ sidewall and cone insulated cladding 1” females NPT jacket connection
- Inside seams blended smooth. 4B finished outside
- high pressure manway 14.7 psi max
- Three polished stainless legs.
- 2” TC for CIP spud all other fittings to be 1.5” tri-clamp style.
- Ferrules/ports include as drafted